Our Blog

HIGH VOLTAGE DIRECT CURRENT LINE SA.PE.I. FIUMESANTO (SS) – LATINA (LT)

REALIZED

Volumes:

453.500 cbm


Total cost:

46.744.505 €


Date:

2007-2011


Status:

Construction completed


Client:

ABB Power Technologies AB Terna S.p.A


Program:

Converter station


FINAL AND DETAILED DESIGN. CONSTRUCTION SUPERVISION.

High voltage line (1000MW ± 50kV), civil works and installation of electrical equipment in order to create converter stations in Fiumesanto (Sardinia) and Latina (Lazio), Italy

The SA.PE.I. project provides the construction of a submarine high-voltage direct current line (1000 MW ± 500 kV) between new electrical stations of Fiumesanto and Latina. HVDC will allow electricity distribution between power trasmission lines of Sardinia and Italian Peninsula.


Tags:

babyporte Pas Cher pandora shop tw louis Vuitton Prijzen adidas pas cher Nike Pas Cher Herveleger dress shop louisvuittontw Canada Goose Danmark Canada goose cheap canada goose femme pas cher Michael Jordan Jersey New Balance Australia outlet sac à main goyard pas cher canadiensstore.com sac à main Louis Vuitton Pas Cher kshatriyasuperlam www.usvirent.com

This is a unique website which will require a more modern browser to work! Please upgrade today!